List of last completed works (as of January 2024)
As of January 2024, the company has completed about 153 projects, for each of them a positive result has been obtained (approval, agreement, technical conditions, positive conclusion of the non-departmental examination).
— Grid connection study with approval and receipt of Technical conditions from transmission system operator;
— Feasibility study with approval and obtaining the conclusion of the State Expertise;
— Detailed design with approval and receipt of the conclusion of the State Expertise, as well as getting a construction permit;
— Authors supervision for construction process;
Justifying calculations on power system integration of SPP Burnoe with power quality assessment and obtaining approval from KEGOC.
— Grid connection study with approval and receipt of Technical conditions from transmission system operator;
— Feasibility study with approval and obtaining the conclusion of the State Expertise;
— Detailed design with approval and receipt of the conclusion of the State Expertise, as well as getting a construction permit;
— Authors supervision for construction process;;
— Justifying calculations on power system integration of SPP Kapshagay (Nurgisa) with power quality assessment and obtaining approval from KEGOC.
— Grid connection study with approval and receipt of Technical conditions from transmission system operator;
— Feasibility study with approval and obtaining the conclusion of the State Expertise;
— Detailed design with approval and receipt of the conclusion of the State Expertise, as well as getting a construction permit;
— Authors supervision for construction process;
— Justifying calculations on power system integration of SPP Baikonyr with power quality assessment and obtaining approval from KEGOC.
— Amendment of Grid connection study with approval and receipt of Technical conditions from distribution system operator (OZhT);
— Detailed design with approval and receipt of the conclusion of the State Expertise, as well as getting a construction permit;
— Authors supervision for construction process;
— Justifying calculations on power system integration of SPP Zadarya with power quality assessment and obtaining approval from KEGOC/OZhT (in process).
— Grid connection study with approval and receipt of Technical conditions from transmission system operator;
— Feasibility study with approval and obtaining the conclusion by out-of-departmental expertise;
— Detailed design (cost estimate calculation) with approval and receipt of the conclusion by out-of-departmental expertise, as well as getting a construction permit;
— Justifying calculations on power system integration of WPP-1 approval from KEGOC JSC for WPP commissioning was obtained.
— Pre-FS documentation for renewable energy source within preparation to RES auction — 50 MW solar power plants near the village of Shaulder in Turkestan region; Preparation of technical documentation ITT Based on Pre-FS documentation in the fall 2019 RES auction was successfully held;
— Author’s supervision for the construction of the SPP Shaulder Early works objects. Construction of Early works objects successfully completed.
— Grid connection study of run-of-river HPP on Kora river in Zetysu region;
— Obtainment of Grid connection permit from KEGOC JSC and Karatal-Transit LLP.
— Grid connection study for HPP-2 on Chizha river in Zhetysu region with approval from KEGOC JSC and Karatal Tranzit LLP;
— Obtainment of Technical conditions.
— Grid connection study for 50 MW WPP in Kostanay region with approval from KEGOC JSC and MRET LLP;
— Obtainment of Technical conditions.
— Grid connection study for 50 MW SPP in Almaty region with approval from KEGOC JSC;
— Obtainment of Technical conditions.
— Comparative analysis of the characteristics of RES equipment with the requirements of the System Operator in terms of ensuring stable operation and power quality indicators;
— Making up a model of RES and performing justifying calculations on the Kazakhstan power system simulation model;
— Analysis of the results, conclusions/recommendations, coordination with the electric grid company and the transmission system operator.
— Over the years of operation ESR received loyalty from our regular customers;
— Not a single unsatisfied customer or claim during the period of existence of the company.
Contact information:
LLP "Energy System Researches"
050012, Republic of Kazakhstan, Almaty, st. Zhambyl 114/85 (corner of Baitursynov street), office 235.
Phone: +7 727 293 70 97, +7 727 292-03-70
Email: info@esr.kz, Email: tyugay.valeriy@esr.kz
Web: esr.kz